To be a century-old enterprise, to be the world's respect for China's manufacturing products
Inquiry
Form loading...
Running Track Two-Component Full PU Polyurethane Paving Material

Sports Track And Field

Running Track Two-Component Full PU Polyurethane Paving Material

This product is a two-component, hand brush polyurethane running track material, which is composed of isocyanate and polyether polyol reaction in a certain proportion, adding some reinforcing agents and other additives. This product has excellent mechanical properties, good leveling, integral film, continuous coating, dense, no seams, beautiful and practical.

    Characteristics of the product

    ● Cured at room temperature.
    ● Excellent physical and chemical properties, all kinds of substrates have good adhesion.
    ● Convenient construction, high efficiency, one construction can meet the design thickness requirements.
    ● Using manual scraping or rolling coating construction, simple, convenient and controllable.

    Product Parameters

    Test data

    Part A

    Part B

    Appearance

    Red viscous liquid

    Colorless clear liquid

    Viscosity/30℃

    20000-30000Mpa·s

    3500-4000Mpa·s

    NCO content /%

    /

    7.5±0.2

    Operation time

    0.5-2h(The higher the temperature, the shorter the operation time)

    Curing time

    18-72h(The higher the temperature and humidity, the shorter the time, and the longer the vice versa)

    Tensile strength

    1.0-1.5Mpa

    Elongation at break

    100-150%

    Applications

    Schools, stadiums and other common used plastic track.
    Running track (5)
    Running track (6)
    Running track(4)

    Packing

    Part A 250kg, Part B 200kg, iron drum packing.

    Storage

    Sealed storage of coatings in dry, cool, and well ventilated conditions, avoiding sunlight and rain, and keeping away from sources of fire.

    Construction conditions

    1)Base surface requirements: The concrete base surface should be cleaned, repaired flat, and polished to a certain roughness. Ensure that the concrete curing is completed, the strength reaches C25 or above, and the moisture content is less than 8%. After processing the base surface, the next process should be carried out as soon as possible.
    2)Environmental temperature and humidity requirements: The environmental temperature at the construction site should be above 5 ℃, and construction can only be carried out when the relative humidity is less than 85%
    3)Ventilation conditions: Ventilation should be maintained during construction.

    Operation methods and requirements

    1.Part A and Part B are stirred evenly according to the ratio of 5:1, and the appropriate proportion of catalyst is added according to the different temperature and humidity.
    2.During construction, in order to ensure the adhesion between layers, sanding is performed (Note: sanding floating dust must be cleaned with a vacuum cleaner). Roll on solventless epoxy sealing primer. After the primer is completely cured, pour the uniform mixture of Part A and Part B onto the floor, scrape it evenly with a trowel (3mm or 5mm bread knife can be used according to the thickness), and proceed to the next process after curing. It is completely cured in 18 hours at normal temperature. If there is bad weather such as rain after painting, an interface agent must be painted before the next process.

    Suggested use qty 

    Single square meter dosage ≥1.3kg/mm