To be a century-old enterprise, to be the world's respect for China's manufacturing products
Inquiry
Form loading...
Basketball Pickleball Badminton Tennis Silicon PU Sport Courts  Material

Sports Track And Field

Basketball Pickleball Badminton Tennis Silicon PU Sport Courts Material

This product is a single-component, hand brush polyurethane court material, which is composed of isocyanate and polyether polyol reaction in a certain proportion, adding some reinforcing agent, defoamer and other additives. This product has excellent mechanical properties, good flexibility, weather resistance and water resistance, leveling and surface smoothness and brightness.

    Characteristics of the product

    ● Cured at room temperature.
    ● Excellent physical and chemical properties, all kinds of substrates have good adhesion.
    ● Convenient construction, high efficiency.
    ● Manual scraping and coating construction, simple, convenient and controllable.
    ● Single component material is easy to use.

    Product Parameters

    Test data

    QT

    Appearance

    Green viscous liquid

    Viscosity/30℃

    4000-6000Mpa·s

    NCO content /%

    /

    Operation time

    0.5-1h(The higher the temperature, the shorter the operation time)

    Curing time

    18-72h(The higher the temperature and humidity, the shorter the time, and the longer the vice versa)

    Tensile strength

    1.3-1.7Mpa

    Elongation at break

    100-200%

    Applications

    Schools, stadiums and other common used a variety of fields.
    sport court(2)
    sport court (5)
    sport court (4)

    Packing

    30kgs/drum

    Storage

    Sealed storage of coatings in dry, cool, and well ventilated conditions, avoiding sunlight and rain, and keeping away from sources of fire.

    Construction conditions

    1)Base surface requirements: The concrete base surface should be cleaned, repaired flat, and polished to a certain roughness. Ensure that the concrete curing is completed, the strength reaches C25 or above, and the moisture content is less than 8%. After processing the base surface, the next process should be carried out as soon as possible.
    2)Environmental temperature and humidity requirements: The environmental temperature at the construction site should be above 5 ℃, and construction can only be carried out when the relative humidity is less than 85%
    3)Ventilation conditions: Ventilation should be maintained during construction.

    Operation methods and requirements

    Add 0.7%-1% water to QT and stir well. During construction, in order to ensure the adhesion between layers, sanding is performed (Note: sanding floating dust must be cleaned with a vacuum cleaner). Roller coating sealing primer, after the primer is completely cured, thin scraping with a leather rake, the thickness of 1~1.5㎜ is appropriate, the scraping time interval before curing (generally about 12 hours, depending on the weather conditions on the site) until the required thickness.
    (It is recommended to use all within 40 minutes after mixing, otherwise the viscosity will increase sharply, affecting the continued use). After curing can proceed to the next process. It is completely cured in 18 hours at normal temperature. If there is bad weather such as rain after painting, an interface agent must be painted before the next process.

    Suggested use qty 

    Single square meter dosage ≥1.3-1.5kg/mm